Module 1 – LVRR Background
|
1.1 The purpose of LVRRs |
| 1.2 The LVRR management framework | |
| 1.3 The problems of LVRRs | |
| 1.4 The road environment | |
| 1.5 Current LVRR design in Lao | |
| 1.6 Review of Module 1 | |
Module 2 – LVRR Environment
|
2.1 LVRR design |
| 2.2 Environmentally Optimised Design | |
| 2.3 Variable longitudinal design principle | |
| 2.4 LVRR road deterioration | |
| 2.5 LVRR whole life asset costs | |
| 2.6 Review of Module 2 | |
Module 3 – LVRR Design process
|
3.1 Introduction to the design process |
| 3.2 Does the road fit the LVRR envelope? | |
| 3.3 Alignment | |
| 3.4 Drainage | |
| 3.5 Pavement | |
| 3.6 Cross section | |
| 3.7 Whole life asset costing | |
| 3.8 Variable design standard | |
| 3.9 Design review | |
| 3.10 Review of Module 3 | |
| 3.11 Preparation for site exercise | |
Module 4 – LVRR Design in practice
|
4.1 Visit 1 – Site discussion |
| 4.2 Visit 2 – Site exercise | |
| 4.3 Preparation of presentations | |
| 4.4 Presentations | |
| 4.5 Review of Modules 1-4 | |
| 4.6 Review of pilot course |
![]() |
![]() |
![]() |
November 07 Pilot Training Course