The Second Mekong International Bridge

Location : Savannakhet - Mukdahan. (Savannakhet Province)
Length of Bridge: 1.6 Km
Width : 12 m
Construction Cost: 4,753,713,823 Japanese Yen
Type: Segmental Box Girder
Funded by: JBIC
Detailed Design Period : Apr. 1999 - Mar. 2000

Topographic survey & basic detailed design, included border facilities buildings drawings.

Construction Supervision Period : Aug.2002 - Dec.2006

Construction supervision, quality control of work, monitoring survey and investigation work, daily monitoring of the construction work, monitoring of the contractor's work program, equipment and construction materials.